Installation Plan for a Middle Parking Space Using a Suspension Type Lifting Column
Here's a step-by-step installation plan leveraging a suspension type charging pile lifting column:
1. Site Assessment and Preparation:
● Thorough Survey: Map out the exact dimensions of the middle parking space, noting any overhead obstructions (e.g., pipes, ventilation, lighting) and ground-level obstacles.
● Foundation and Utility Preparation: Ensure the charging pile's concrete foundation is cured and all electrical conduits and data lines are correctly stubbed up and ready for connection.
● Clearance Zone: Establish a clear safety zone around the installation area, potentially blocking off adjacent parking spots temporarily.
2. Lifting Column Setup:
● Overhead System Installation: Depending on the specific type of suspension lifting column, this involves either setting up a temporary gantry over the parking space or utilizing existing overhead structural elements (if certified for the load).
● Hoist and Rigging Attachment: Securely attach the electric hoist and the specialized suspension rigging (slings, clamps) to the overhead support system. Ensure all connections are rated for the charging pile's weight.
3. Charging Pile Preparation:
● Unpackaging and Inspection: Carefully unpackage the charging pile and conduct a visual inspection for any transit damage.
● Rigging Attachment: Securely attach the suspension rigging to the designated lifting points on the charging pile. This must be done according to the manufacturer's specifications to ensure balance and prevent damage.
4. Lifting and Positioning:
● Initial Lift: Slowly raise the charging pile a few inches off the ground to confirm balance and rigging integrity.
● Horizontal Maneuver (if applicable): If the charging pile needs to be moved horizontally into the exact position, carefully guide it using the overhead system's controls or manual push/pull (if safe and light enough).
● Lowering and Alignment: Gradually lower the charging pile. As it nears the foundation, make micro-adjustments using the lifting column's precise controls to align the mounting holes and conduit entry points perfectly.
5. Anchoring and Utility Connection:
● Secure Fastening: Once perfectly aligned, bolt the charging pile securely to the concrete foundation according to manufacturer specifications.
● Electrical and Data Connections: Connect all necessary electrical wiring, data cables, and any other utilities (e.g., cooling lines for high-power chargers).
● Testing: Conduct comprehensive electrical and functional tests to ensure the charging pile is operating correctly and safely.
6. Final Checks and Site Restoration:
● Remove Rigging: Once the charging pile is fully secured and stable, carefully remove the suspension rigging.
● Column Dismantling: Dismantle the suspension type lifting column and clear the installation area.
● Site Cleanup: Restore the parking space and surrounding area, removing any debris or equipment.
By adopting a Suspension Type Charging Pile Lifting Column, installers can confidently and efficiently tackle the complexities of deploying charging infrastructure in even the most challenging middle parking spaces, ensuring a smoother, safer, and more precise installation process.
-
Installation Plan for a Middle Parking Space Using a Suspension Type Lifting Column
-
Installation Plan for a Middle Parking Space Using a Suspension Type Lifting Column
-
Installation Plan for a Middle Parking Space Using a Suspension Type Lifting Column
-
Installation Plan for a Middle Parking Space Using a Suspension Type Lifting Column